Across Indian cities, slums are far more than just patches of poverty on the urban map. They are working neighbourhoods that house drivers, domestic workers, construction labourers, street vendors, and small entrepreneurs who keep the city running. According to the 2011 Census, around 65.5 million people, or 17.4% of the urban population, were living in slums. Demolishing these settlements or pushing residents to the city’s edge has rarely worked. A more humane and effective approach has emerged: slum upgradation. It is a strategy that improves where people already live, rather than removing them from their homes and livelihoods.
Table of Contents
- What is slum upgradation?
- The core components of upgradation
- Why slum upgradation matters
- Reducing exclusion and protecting dignity
- Public health and child development
- Economic gains for the whole city
- Avoiding the failures of relocation
- The Indian policy journey
- Early legislative steps
- JNNURM and BSUP
- Rajiv Awas Yojana: the slum-free city vision
- PMAY-U and in-situ slum redevelopment
- What makes upgradation actually work?
- Community participation from day one
- Land tenure clarity
- Convergence with other schemes
- Climate resilience
- Avoiding gentrification and displacement by stealth
- The road ahead
What is slum upgradation?
Slum upgradation is the process of improving existing informal settlements through better infrastructure, access to services, legal recognition, and community facilities, while allowing residents to continue living in the same location. It is fundamentally an in-situ approach, meaning “on the same site.” Instead of bulldozing homes and shifting families to peripheral resettlement colonies, upgradation works with what already exists and builds on it gradually.
The concept moves away from viewing slums as eyesores to be cleared. Instead, it treats them as functional neighbourhoods whose residents have already invested years of labour, savings, and social ties into building a community. Upgradation simply adds what the formal city has long denied them: paved lanes, water connections, toilets, drainage, electricity, street lights, schools, health posts, and most importantly, security against arbitrary eviction.
The core components of upgradation
A well-planned upgradation programme typically covers four broad dimensions. Physical infrastructure includes drinking water supply, individual or community toilets, sewerage, storm-water drains, internal roads, and street lighting. Social infrastructure covers community halls, anganwadis, primary health centres, and schools within or close to the settlement. Tenure security involves granting some form of legal recognition, ranging from no-eviction guarantees to full property rights. Economic and livelihood support includes skill training, microfinance access, and linkages to social welfare schemes.
Among these, security of tenure is widely regarded as the most powerful trigger. A peer-reviewed study using National Sample Survey data found that notification of slums and security of tenure are among the most important determinants of slum upgradation, with improvements in electricity and water supply spurring further improvements in other basic services. When families stop fearing demolition, they begin investing their own money into stronger walls, better roofs, and small additions to their homes.
Why slum upgradation matters
The case for upgradation is not just moral, it is also economic, social, and environmental. Slums represent enormous human capital that is currently trapped by poor living conditions. Unlocking that potential benefits the entire city.
Reducing exclusion and protecting dignity
Slum residents often lack official addresses, which means they struggle to open bank accounts, enrol children in nearby schools, or access ration cards and government schemes. Upgradation, especially when paired with notification and documentation, brings these households into the formal civic system. More than 90% of the urban housing shortage is faced by economically weaker sections and low-income groups, which means any serious effort at inclusive cities must begin with where these households actually live.
Public health and child development
The absence of toilets, drainage, and clean water in slums causes recurring outbreaks of diarrhoea, typhoid, dengue, and tuberculosis. Children pay the heaviest price through stunting, repeated illness, and missed schooling. Adding basic sanitation and piped water dramatically cuts disease burden. The UN-Habitat framework treats access to safe water, sanitation, sufficient living area, durable housing, and security of tenure as the five defining indicators of adequate housing. Upgradation directly targets all five.
Economic gains for the whole city
Slum residents are essential to the urban economy. They form a large share of the workforce in construction, transport, domestic services, hospitality, and informal manufacturing. When a settlement gets paved roads, reliable water, and toilets, households save hours every day previously spent fetching water or queuing at public latrines. That time converts into work, study, or rest. Upgraded areas also see increased small business activity, as women in particular feel safer running home-based enterprises after street lighting improves.
Avoiding the failures of relocation
Earlier policies of slum clearance and relocation to distant resettlement colonies have a poor track record. Families lose access to their workplaces, schools, and social networks. Many quietly return to informal settlements closer to the city centre, defeating the purpose of the displacement. In-situ upgradation avoids this cycle by keeping people connected to the economic opportunities that drew them to the city in the first place.
The Indian policy journey
India’s response to slums has shifted significantly over the decades, moving from clearance toward upgradation and finally toward in-situ redevelopment.
Early legislative steps
The first major intervention was the Slum Areas (Improvement and Clearance) Act, 1956, which provided a framework for notifying slum areas and protecting tenants from arbitrary eviction. The Environmental Improvement of Urban Slums (EIUS) programme, started in 1972, focused narrowly on water supply, sewers, storm drains, and community baths.
JNNURM and BSUP
A bigger shift came with the Jawaharlal Nehru National Urban Renewal Mission (JNNURM) launched in 2005, which contained a dedicated sub-mission called Basic Services to the Urban Poor (BSUP) for the largest cities and the Integrated Housing and Slum Development Programme (IHSDP) for smaller towns. These schemes combined housing construction with infrastructure upgrades and basic services.
Rajiv Awas Yojana: the slum-free city vision
The most ambitious upgradation effort came with Rajiv Awas Yojana (RAY), launched in 2011 under the Ministry of Housing and Urban Poverty Alleviation. According to the official scheme guidelines, RAY envisages a “Slum Free India” with inclusive and equitable cities in which every citizen has access to basic civic infrastructure, social amenities and decent shelter. The scheme’s most important conceptual breakthrough was its insistence on bringing all slums, whether notified or non-notified, into the formal city system.
RAY had a distinctive two-step strategy. First, states and cities prepared a Slum-Free City Plan of Action (SFCPoA) after surveying and mapping every slum, often with GIS support. Second, they prepared Detailed Project Reports for selected slums. The scheme also pushed states to assign property rights to slum dwellers, a politically difficult but socially transformative reform. Although the scheme aimed to promote a slum-free India by providing property rights to slum dwellers and the urban poor through states and union territories, its actual rollout faced challenges of state cooperation, slow land record updating, and limited financial flow.
PMAY-U and in-situ slum redevelopment
RAY was eventually subsumed under the Pradhan Mantri Awas Yojana – Urban (PMAY-U), launched in 2015 with a Housing for All target. PMAY-U has four verticals, of which one is directly focused on slums. Under the In-situ Slum Redevelopment (ISSR) vertical, a slum redevelopment grant of one lakh rupees per house is admissible for all houses built for eligible slum dwellers using land as a resource with participation of private developers. The model uses the slum land itself as a financial asset: a private developer builds houses for slum families and is allowed to build saleable units on the remaining land for cross-subsidisation.
The newer PMAY-U 2.0, approved in 2024, continues this approach with expanded coverage. Independent reviews, however, point out implementation gaps. Although PMAY-U aims to address slum housing through the In-Situ Slum Redevelopment vertical, its implementation has reached only about 13% of its intended beneficiaries, highlighting that the upgradation challenge is far from solved.
What makes upgradation actually work?
Decades of Indian and international experience have produced a clear sense of what separates successful upgradation from failed projects.
Community participation from day one
Top-down projects that arrive with bulldozers and contractors rarely succeed. The most durable upgradation programmes involve residents in deciding what to build, where the lanes should run, and how community spaces should be used. Slum dwellers’ federations, mahila mandals, and resident welfare groups bring local knowledge that no outside engineer can replicate.
Land tenure clarity
Without clarity on who can stay and on what terms, no real investment follows. Even partial guarantees, such as a no-eviction commitment for a fixed number of years, can unlock household-level investment. Full property titles bring the strongest gains but are also the most politically sensitive.
Convergence with other schemes
An upgraded slum still needs ration cards, anganwadis, health services, school enrolment, and skill training. Successful upgradation programmes converge with the National Health Mission, ICDS, Swachh Bharat Mission, AMRUT (for water and sanitation networks), and the Deendayal Antyodaya Yojana – National Urban Livelihoods Mission.
Climate resilience
Many slums are located on flood plains, along storm-water drains, or on steep slopes. Modern upgradation now incorporates flood-resistant drainage, heat-resistant building materials, and improved ventilation. As Indian cities face more frequent heatwaves and extreme rainfall, this dimension is becoming non-negotiable.
Avoiding gentrification and displacement by stealth
One risk in upgradation, especially when paired with rising land values, is that original residents quietly sell out and move to other informal settlements. Good programmes design safeguards such as lock-in periods on resale, protections against subletting, and continuous social audits.
The road ahead
India’s urban population is projected to add hundreds of millions over the coming decades. If formal housing markets continue to underserve the poor, new informal settlements will keep emerging, no matter how many existing ones are upgraded. Several Indian cities already report over a quarter of their population living in slums, with Jabalpur topping the list at 45%, followed by Greater Visakhapatnam, Meerut, Greater Mumbai, and Raipur. The lesson is that upgradation cannot be a one-time clean-up. It has to go hand-in-hand with a sustained supply of affordable rental and ownership housing, fair land use planning, and inclusion of migrants in the urban fabric.
Slum upgradation, in the end, is a test of whether Indian cities can be honest about who lives in them. The residents of these settlements are not outsiders to the city. They are its workers, its caregivers, its delivery riders, and its small entrepreneurs. Treating their neighbourhoods with the same seriousness as any other part of the city is not charity. It is sound urban policy.
What do you think? Should slum upgradation prioritise granting full property rights to residents, or is long-term tenure security with strong eviction protection enough to encourage investment and dignity? And how can cities make sure that upgraded settlements do not eventually price out the very families they were built for?
References
- https://nbo.gov.in/pdf/SLUMS_IN_INDIA_Slum_Compendium_2015_English.pdf
- https://www.tandfonline.com/doi/full/10.1080/02673037.2017.1291915
- https://www.drishtiias.com/mains-marathon-daily-answer-writing-practice/papers/2022/slums-urban-areas-reality-mega-cities-do-you-agree-that-indias-urban-development-yet-inclusive-gs1-indian-society/print
- https://unhabitat.org/sites/default/files/2020/06/indicator_11.1.1_training_module_adequate_housing_and_slum_upgrading.pdf
- https://mohua.gov.in/upload/uploadfiles/files/SAICA_1956.pdf
- https://mohua.gov.in/upload/uploadfiles/files/RAYGuidelines.pdf
- https://www.indiafilings.com/learn/rajiv-awas-yojana-ray/
- https://pmay-urban.gov.in/about
- https://www.impriindia.com/insights/pradhan-mantri-awas-yojana-urban-pmayu/

Leave a Reply